Bath's Georgian streets, listed buildings and hills sit next to ordinary suburban homes. The World Heritage context makes external equipment and visible cabling a planning issue in much of the centre.
The houses, not the postcode average
Lead, stone and listed roofs are often a no for panels. Later suburbs can be a normal solar roof.
An internal battery can still be acceptable where an external cabinet on a stone elevation is not. The survey should separate those options.
Hills and coach-busy streets affect delivery.
What gets fitted here
Suburban houses take hybrid systems. Centre properties need a heritage check before anyone talks brand.
South West yield helps the annual figure. It does not remove heritage constraints.
National Grid Electricity Distribution, yield and a 4 kWp example
A 4 kWp array at 1020 kWh per installed kilowatt is about 4,080 kWh a year before shade. That is the local ceiling on solar charging, not a promise the battery will cycle fully in January.
In Bath, on National Grid Electricity Distribution, 3.6 kW is in the band where G98 connect-and-notify is often enough. Export can still be capped. Agree that before the inverter is ordered. The figure uses 5 kWh and 4 kWp, which is enough to tell two quotes apart if they assumed something else.
Take a 5 kWh pack, cycled about 260 times, at 90% round trip. Charge at 7.0p, and value what comes back at 26.0p. Export given up is priced at 4.0p. About 743 kWh a year of the charge is treated as spare solar from 4 kWp that might otherwise have been exported. Delivered energy is about 1170 kWh. After charging cost and lost export, the figure saves about £241 a year. Set that against £5,650 fitted, which is a September 2026 illustration at the temporary 0% residential rate, not a quote. That is a simple payback of about 23.4 years, which is past a typical 10-year warranty. Nudge the night rate up by 4p and see if you still like it.
What I would not sign in Bath
Where the job is a qualifying install in a home, the 0% rate runs to 31 March 2027 and is due to become 5% after that. This figure prices the work at £5,650 on that basis. It does not apply to a shop, and it does not apply to a battery you buy and fit yourself.
I would not sign off a 5 kWh install from a video call. Someone has to open the consumer unit.
Listed stone will veto a visible cabinet that a suburban garage would never have argued about.
Common questions
Is the price on this page a quote?
No. £5,650 is a September 2026 illustration for a 5 kWh example at the temporary 0% residential rate. Your survey replaces it.
Will it stay on in a power cut?
Only if a gateway or essential-load board was designed and paid for. A standard grid-tied battery turns off with the grid. On this 5 kWh example the inverter is 3.6 kW, and backup is still a separate line.
What paperwork should I keep?
Keep the MCS certificate where the job is certified, the electrical certificate, the DNO record, the schematic, the warranty registration and a photo of the schedule. For an illustrated £5,650 job, that folder is part of what you bought.
What if the cheap rate is not 7p?
Then the figure changes. This page used 7.0p as a charge rate and 26.0p as the rate avoided. A smaller gap means a worse payback. Read the live tariff.